Menu

References

Tebis Consulting in Practice

Tebis Consulting brings measurable success, whether that means faster machine run times or throughput, greater efficiency, or cost-effectiveness. The statements from our customers confirm this:


MECO Maschinen-Elektro-Companie GmbH in Waldershof is active in draw die manufacturing. The company wanted to increase machine run times by 10-15 percent, implement multiple-machine operation and introduce paperless manufacturing. Machine run times actually increased by 20 to 30 percent after consulting by Tebis. Multiple-machine operation is now a part of everyday life for Meco.

We have achieved all of the goals initially set to optimize our production process chain.

Frieda Reiss, manager

Register for the Tebis newsletter and stay up to date.

Seminars

Continuous manufacturing

Countless studies show: 40 to 50 percent of a plant’s entire throughput time is caused by unnecessary idle periods. This is often due to a flawed material flow. In 90 percent of cases, idle periods can be drastically reduced by…

Read more

Success story

Optimal control for maximum quality

The ability to turn and mill components made of titanium-, steel- or aluminum alloys in a single cycle can be a challenging undertaking. Aspa, a precision machining company from Italy, quickly completes even complex manufacturing…

Read more