Menu

Manufacturing planning and control

Integrate ERP systems and establish central information hub for manufacturing (MES)

Establish the connection to ERP systems using the powerful Proleis client/server product palette from our cooperation partner ID GmbH. You can plan your manufacturing, make optimal use of resource capacity, develop and consistently apply strategies for bottlenecks. Job lists for personnel and machine assignment scheduling are available at Tebis workstations and are integrated in the Tebis user interface. The entire logistics cycle is supported, from procurement to goods receiving and management of storage areas to the generation of transport orders. You can also manage your tool magazine and create assembly orders for the setup area and can thus ensure a reliable tool supply to the machines.

The Server Connection and Structure Tree Connection Proleis add-ons from the Data Management category are required to perform manufacturing planning and control on Tebis workstations.

Manufacturing planning and control

Contact

Tebis Product Consulting will be happy to help you:

+49/89/81803-0 Further information

You can use this add-on to link defined manufacturing steps to machines with processing steps in Tebis. This lays the foundation for determining tool demand and utilization times in tool supply. Job Manager synchronization is the prerequisite for the Tool Logistics - Proleis and Tool Setup Orders - Proleis add-ons.

Benefits

  • Link planning data with NC programming data
  • Determine tool implementation and machining times
  • Assign direct planning steps in Tebis

Specifications

  • Display relevant planning steps for the part
  • Assign Tebis machining steps to a planning step
  • Automatically assign Tebis templates as a function of machine, implementation type and part category

Application

  • Determining implementation times for tool supply

Register for the Tebis newsletter and stay up to date.

Seminars

Continuous manufacturing

Countless studies show: 40 to 50 percent of a plant’s entire throughput time is caused by unnecessary idle periods. This is often due to a flawed material flow. In 90 percent of cases, idle periods can be drastically reduced by…

Read more

Success story

Optimal control for maximum quality

The ability to turn and mill components made of titanium-, steel- or aluminum alloys in a single cycle can be a challenging undertaking. Aspa, a precision machining company from Italy, quickly completes even complex manufacturing…

Read more