Menu

Continuous manufacturing

Reduce throughput time

Countless studies show: 40 to 50 percent of a plant’s entire throughput time is caused by unnecessary idle periods. This is often due to a flawed material flow. In 90 percent of cases, idle periods can be drastically reduced by implementing simple measures. The solution consists of a critical evaluation of the supply chain and its response capability, which is the key to long-term success.
All seminars are offered in German. English seminars are available on request.


Learn more:

Part 1: Basic principle of logistics flow

  • Efficiency versus fast response and supply chains
  • Comparison of products with supply-chain
  • Understanding demand structure
  • Conditions, meaning and controllability of logistics flow
  • Push-pull principle

Part 2: Basic principle of material flow

  • Understanding your own flows of material and information
  • Case study: conventional and ideal material flow
  • More information for greater reliability: ideal goods receiving
  • Fewer questions = smoother process flow
  • Case study: conventional and ideal information flow
  • Simulation of material flow
Sign up

Register for the Tebis newsletter and stay up to date.

Seminars

Continuous manufacturing

Countless studies show: 40 to 50 percent of a plant’s entire throughput time is caused by unnecessary idle periods. This is often due to a flawed material flow. In 90 percent of cases, idle periods can be drastically reduced by…

Read more

Success story

Reducing downtime through automation

Tennant Company is one of the world’s largest suppliers of industrial cleaning equipment to industries ranging from automotive to retail. Today, they are recognized as a global leader in designing, manufacturing and marketing…

Read more